- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Bharat Heavy Electricals Limited
- >
NTID 39136851
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCivil Work For Construction Of in Haridwar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Civil Work For Construction Of" in Haridwar, India.
Bharat Heavy Electricals Limited
Haridwar, Uttarakhand, India
NTID 39136851
- Opening Date : Thu 20th February, 2025
- Closing Date : Thu 20th February, 2025
- ₹ 90321585.00
- NTID 39136851
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
Refer Documents -
Estimated Cost
90321585.00
BOQ Items Total Items : 189 | Total Qty : 727752.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish:5 km Unit:cum | 1500 | cum |
| 2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Earth:5 km Unit:cum | 60000 | cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.: All kinds of soil Unit:cum | 50000 | cum |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.:All kinds of soil. Unit:cum | 1500 | cum |
| 5 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil:Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia Unit:metre | 650 | metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054