- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Agra Development Authority
- >
NTID 46006377
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCc Construction Work From The in Agra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Cc Construction Work From The " in Agra, India.
Agra Development Authority
Agra, Uttar Pradesh, India
NTID 46006377
- Opening Date : Wed 29th July, 2026
- Closing Date : Tue 28th July, 2026
- ₹ 0.00
- NTID 46006377
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26000.00 -
Document Cost
3540.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 11 | Total Qty : 873.55
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DRAIN (PART-A) : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineerin-charge. 2.6.1 All kinds of soil DSR 2023 | 59 | Cum |
| 2 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 course sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR No. 4.1.8/2023) | 12 | Cum |
| 3 | Class-150 (Non Modular) brick work in 1:4 (1 Part Cement : 4 Part Coarse Sand) in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (DSR-2023/6.1.1) | 33.25 | Cum |
| 4 | 12mm Thick cement plaster 1 cement : 4 Coarse sand (Item No. 13.4.1 DSR-2023) | 192 | Sqm |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shutterang, finishing and excluding reinforcement - Above plinth level upto fifth floor lable : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone (DSR 2023 5.1.2) | 1.8 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054