- Home
- >
- Tender
- >
- Andaman and Nicobar Islands Tender
- >
- Department of ANDAMAN LAKSHADWEEP HARBOUR WORKS
- >
NTID 43147381
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCasting Of 8 Ton Tetrapod At T in RANGAT - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Casting Of 8 Ton Tetrapod At T" in RANGAT, India.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
RANGAT, Andaman and Nicobar Islands, India
NTID 43147381
- Opening Date : Wed 24th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 2734850.00
- NTID 43147381
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
54697.00 -
Document Cost
Refer Documents -
Estimated Cost
2734850.00
BOQ Items Total Items : 3 | Total Qty : 200
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Casting of 8.00 Ton tetrapods of 3.33 cum with CC 1:1.5:3 mix (1) cement, 1.5 Pulverised stone sand & 3 (40mm @60%, 20mm @30% & 10mm @10% of nominal size stone aggregate), excluding cost of steel moulds and hire charges of crane which will be provided on free of cost with POL & Operator by the department at Andaman Lakshadweep Harbour Works, Rangat Bay including cost of cement, pulverised sand, stone aggregate, assembling the tertrapod mould including arranging sand bags filled with local quarry dust to support the bottom of the mould, oiling of steel moulds, cost of waste oil, mixing concrete, placing inside the mould, cost of hire charges of mixer machine, vibrator, transportation of all materials to work site etc., complete. The rate is inclusive of all consumable items and GST. | 50.00 | Nos |
| 2 | Conveying and Placing the 08 Ton cap tetrapods from the tetrapod casting yard to break water and placing in position to strengthen the section of break water as per the instruction and direction of the Engineer-in-charge including loading by using crane on the truck, conveying, unloading by crane on end on method at site and placing in position excluding hire charges of crane but including hire charges of truck, driver and POL, cost of manual assistant for releasing the sling and all other labour charges, cost of minor tools etc..,complete. The rate is inclusive of all consumable items and GST. | 50.00 | Nos |
| 3 | Supply, stocking and placing the stone boulder size (20-30 cm) in to the water sea side & lee side filling the cavity as per the instruction and direction of the Engineer-in-charge including cost of stone boulder, loading, stocking at truck, conveying, unloading by track end on method at site and placing in position excluding hire charges of crane but including hire charges of truck, driver and POL, cost of manual assistant for releasing the sling and all other labour charges, cost of minor tools etc...complete. The rate is inclusive of all consumable items and GST. | 100.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054