- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
- >
NTID 43083953
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCarriage And Erection Of 145kv in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Carriage And Erection Of 145kv" in Gorakhpur, India.
UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
Gorakhpur, Uttar Pradesh, India
NTID 43083953
- Opening Date : Wed 17th December, 2025
- Closing Date : Tue 16th December, 2025
- ₹ 0.00
- NTID 43083953
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2000.00 -
Document Cost
590.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 9 | Total Qty : 73
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Following works are to be carried out at 220KV S/S Barahuwa Gorakhpur for Retrofitting of Isolator Disconnectors arm with new design high capacity isolators disconectors of 145KV kv side including cost of men ,misc. consumables T&P etc. to complete the job satisfactory. | ||
| 2 | Opening of old & existing jumpers between main bus- I and bus -II and line side isolators and between bus isolators to circuit breaker . | 30 | Job |
| 3 | Dismantling of old existing different make 145kv isolators installed in 132KV Switchyard by opening of its all accessories including arms , connecting pipes , male & female jaws of all three phases , P.I. & its mechanism box , safe lowering of all components . safe shifting of all dismantled components of different make isolator to store as per guidence of supervising engineer including all cost of labour and T&P ( All 03 phase of isolator considered as one job ) | 5 | Job |
| 4 | Erection of New 145KV Isolator of 132KV Switchyard of its complete mechanism like P.I.,Isolator arm assembly , male ,female Jaw , connecting pipe , earthing blade ( As per requiremnet ) and its mechanism box and then checked complete alignment of new isolator ( work will be carried out as per drawing ). Laying and Termination of different size control cable for NO/NC status from Isolator to control room panel as per direction of supervising engineers(if required) | 5 | Job |
| 5 | Jumpering of conductor asper standard specification in between bus to bus isolators and between bus isolators to circuit breker etc. by proper cutting,bending ,tightening of conductors by using necessary connectors to be provide bydepartment. | 30 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane