- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Military Engineer Services
- >
NTID 45017892
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCa No Cwe hills rkt 03 Of 202 in Ranikhet - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Ca No Cwe hills rkt 03 Of 202" in Ranikhet, India.
Military Engineer Services
Ranikhet, Uttarakhand, India
NTID 45017892
- Opening Date : Tue 26th May, 2026
- Closing Date : Tue 19th May, 2026
- ₹ 7769000.00
- NTID 45017892
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
141535.00 -
Document Cost
1000.00 -
Estimated Cost
7769000.00
BOQ Items Total Items : 37 | Total Qty : 3961.6
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm Exc 50 mm and n exc 100 mm deep complete all as specified and directed. | 87.50 | 10 Sqm |
| 2 | Demolition of base course/ sub base course of flexible pavement i.e broken stone boulders, quarried stone, coarse aggregate of WBM etc in any position and deposition and depsiting where ever directed complete all as specified and directed. | 131.25 | Cum |
| 3 | M & L for for WBM 150mm (compacted thickness) in two layers (75 mm each) with granite trap or basalt aggregate of grading 2( 63 to 40mm size ) or of grading 3 (50 to 20mm size) spread rolled with power roller, 8 to 12 tonne to form a true surface complete all as specified and directed. | 87.50 | 10 Sqm |
| 4 | M/L for applying evenly a priming/tack coat with bituminous primer (Paving bitumen)VG -10 @ 10 Kg per 10 Sqm on unsurfaced water bound macadam incl preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. all as specified. | 175.00 | 10 Sqm |
| 5 | M&L for premix bituminous, macadam with binder content of 4% by weight of total mix using paving bitumen VG-30 grade, laid/ rolled and compacted to required gradient and camber in consolidated thickness 75 mm or less complete all as specified and directed. Note :(i) Aggregates for Bituminous works shall confirm to clause No 20.B.2.5 of SSR 2009 Part- I (ii) Based on job mix formula, in case the binder content (i.e. Bitumen) is less than the content specified under this item then a minus adjustment @ 60 per kg rate of bitumen (less consumption) shall be applied on the quoted rate of contractor against this item, hence the quoted rate of contractor shall be reduced based on less content of bitumen required as per job mix formula. However, no price adjustment on plus side shall be made for increase of quantity of bitumen in case of required as per job mix formula. (iii) Design Mix for bituminous macadam shall be carried out through an authorised testing lab and the cost of testing shall be included in quoted rate. | 87.50 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054