- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Goa Tourism Development Corporation Limited
- >
NTID 44321099
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBeautification Of Shree Brahma in panaji - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Beautification Of Shree Brahma" in panaji, India.
- Opening Date : Wed 18th March, 2026
- Closing Date : Tue 17th March, 2026
- ₹ 13728265.00
- NTID 44321099
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
274565.00 -
Document Cost
8000.00 -
Estimated Cost
13728265.00
BOQ Items Total Items : 30 | Total Qty : 16068
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL | ||
| 2 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 19.00 | 100 Sqm |
| 3 | Earthwork in excavation over areas by mechanical/manual means in all type of strata upto a depth of 3 meters comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc.blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site(at risk and cost of the contractor)for all leads and lifts and as directed by Engineer . | 1841.00 | Cu.m. |
| 4 | Earthwork in excavation for foundation pipeline trenches by mechanical/mannual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site at risk and cost of the contractor) for all leads and lifts and as directed by Engineer . | 68.00 | Cu.m. |
| 5 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers (excluding rock) not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer. | 1034.00 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054