- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Deendayal Port Trust
- >
NTID 43610944
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBeautification Of Gopalpuri Co in Multi city - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Beautification Of Gopalpuri Co" in Multi city, India.
Deendayal Port Trust
Multi city, Gujarat, India
NTID 43610944
- Opening Date : Refer Documents
- Closing Date : Tue 17th February, 2026
- ₹ 68679521.00
- NTID 43610944
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1373590.00 -
Document Cost
1770.00 -
Estimated Cost
68679521.00
BOQ Items Total Items : 500 | Total Qty : 3065665.1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling the existing security cabin/entry gate/road side drain/compound wall including removing / separating out the salvage materials like doors & windows masonary, reinforcement etc as & where position complete including removing the foundation and filling the unwanted material outside Gopalpuri upto 4 km lead, prepare the surface for reconstruction of the beautification of gopalpuri main gate & approch as directed by the Engineer-in-charge . (Measurement will be done based on slab area) | 288.000 | M2 |
| 2 | "Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, All kinds of soil. /filled material/ Road crust consisting of bitumen surface and metallling etc as directed by engineer-in-charge." | 3321.000 | M3 |
| 3 | Taking out existing CC interlocking paver blocks from footpath with kerb stone/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1629.000 | M2 |
| 4 | Disposal of excavated material lead upto 2 km beyond 1.5 km and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. /filled material/ Road crust consisting of bitumen surface and metallling etc. | 2159.000 | M3 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 830.000 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054