Inquiry NowBalance Work For Construction in Budgam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Balance Work For Construction " in Budgam, India.
Public Works Department
Budgam, Jammu and Kashmir, India
NTID 44684719
- Opening Date : Thu 9th April, 2026
- Closing Date : Wed 8th April, 2026
- ₹ 5617000.00
- NTID 44684719
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
112340.00 -
Document Cost
1600.00 -
Estimated Cost
5617000.00
BOQ Items Total Items : 26 | Total Qty : 1826.12
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing & fixing AC -5 (Commercial) 12mm laminated wooden flooring of Action Tesa, Pergo, Armstrong, Green Panel or equivalent made from high density fibre board having density 900 kg/m or more, core board based of dome technology in 12mm thickness, made from lignocellulose material specifically plantation timbers like eucalyptus manufactured with homogeneous core, the flooring shall be tropicalized with an anti-bacterial surface with dimensional stability and laminated with melamine formaldehyde impregnated European made d cor paper (70-120gsm) duly overplayed with an anti abrasion layer of aluminium oxide impregnated tissue (55,65,85 gsm) in AC5 6500 abrasion cycle ) The product shall have an isometric locking profile made from a 5 spindled profiling head. the locking profile shall be wax coated to prevent moisture seepage. as per direction of Engineer-in-charge. | 115.83 | Sqm |
| 2 | Providing and fixing in wall lining (Dila DEDO) of specified High density High Moisture Resistant board, non-laminated, with basic border design using a router or cnc machine with necessary fixing arrangement including water and termite resistant plywood 8mm thick and screws etc. complete as approved by engineer incharge : 18 mm thick | 196.19 | Sqm |
| 3 | Providing and fixing in wall specified High density High Moisture Resistant board, non-laminated, with approved 3D design using a cnc machine with necessary fixing arrangement including water and termite resistant plywood 8mm thick and screws etc. complete as approved by engineer incharge : 18 mm thick | 42.82 | Sqm |
| 4 | Polishing in matt finish Satin Enamel paint on wood work/HDHMR Board in required color/wooden shade texture with following process in the sequence as detailed below: 1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos. 2. Applying two coats of Primer and allowing sufficient drying time for Ist coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On this, Ist coat of Satin Enamel paint is applied with spray gun. This 1st coat is allowed to dry for 24 hrs then the Satin Enamel paint is applied with compressor pressure spray gun using Satin Enamel paint and thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) | 196.19 | Sqm |
| 5 | Polishing in high gloss/matt finish DECO polish on wood work/HDHMR Board in required color/wooden shade texture with following process in the sequence as detailed below: 1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On drying of sealer coat, wet/Dry rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet/Dry rubbing, then surface is applied with special grade Wood fillers to fill all the small and big holes/ grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet/Dry rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of PU polish is applied with spray gun using DECO clear polish and DECO thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final DECO polish is applied with compressor pressure spray gun using DECO Top Coat clear polish and DECO thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) | 42.82 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054