- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of HIGHER EDUCATION
- >
NTID 47474747
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowAnnual Maintenance Of All Buil in Arantangi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Maintenance Of All Buil" in Arantangi, India.
HIGHER EDUCATION
Arantangi, Tamil Nadu, India
NTID 47474747
- Opening Date : Sat 28th November, 2026
- Closing Date : Fri 27th November, 2026
- ₹ 200000.00
- NTID 47474747
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2000.00 -
Document Cost
Refer Documents -
Estimated Cost
200000.00
BOQ Items Total Items : 13 | Total Qty : 228.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Towards the Charges for Labour Supplied by the Contractor to do maintenance of college building work such as clearing the scrub jungles, and dumping at for off places. Filling the pot holes in the approach road and also in low lying area. Uprooting the small plants on the exposed surface of the buildings, cleaning the water tanks fungus formation periodically to up keep clean water removing the dead leaves falling on the open terrace of the building and cleaning the blockage in the rain water down fall pipe and removing blockage in the toilet and urinals, cleaning debris and silt accumulation in the drainage lines and making free flow of water and all other works as per the instruction of the departmental officers to keep the campus neat and term condition in Govt. Polytechnic College , Aranthangi. | ||
| 2 | Mazdoor category-I | 60 | Nos |
| 3 | Carpenter | 8 | Nos |
| 4 | Jungle clearance by JCB | 40 | Hrs |
| 5 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 15.5 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054