Inquiry NowAnnual Maintenance Contract Fo in Kalpakkam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Maintenance Contract Fo" in Kalpakkam, India.
BHABHA ATOMIC RESEARCH CENTRE
Kalpakkam, Tamil Nadu, India
NTID 42426825
- Opening Date : Tue 2nd December, 2025
- Closing Date : Fri 21st November, 2025
- ₹ 1458405.00
- NTID 42426825
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
29168.00 -
Document Cost
Refer Documents -
Estimated Cost
1458405.00
BOQ Items Total Items : 27 | Total Qty : 1094
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in all type of soils, mixture of gravel and disintegrated rock for foundation including bailing / pumping out water wherever required, levelling and ramping the bottom of excavation and refilling the side of excavated material as per specification and drawing up to 1.50metre depth below ground level. | 40.0 | Cu.m |
| 2 | Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Lead charges for lead Exceeding 2Kilometer but not exceeding 3kilometer. Note: 1)The rates in respect of this item are applicable for the net quantities arrived at after making deductions for voids @20% in respect of soil and @50% in respect of rock from the corresponding Stack/ Truck measurements.2) The earth / debris shall be dumped well inside the dumping yard and not over approach pathway. | 40.0 | Cu.m |
| 3 | Supplying and filling the foundation and basement with Quarry dust, filling in the layers of not more than 150mm thick, each layer well rammed and consolidated by hand/mechanical roller including watering, levelling, dressing the top surface to the required level complete all as per specification and as directed by Engineer. | 10.0 | Cu.m |
| 4 | Providing and laying plain cement concrete 1:2:4 using 25mm maximum size hard granite machine graded stone aggregates including mechanical mixing transporting and placing in required position, ramming, consolidating etc.all as per specification and drawing.Note:- cement content 330kg/cu.m | 8.0 | Cu.m |
| 5 | Providing and constructing brick masonry using well burnt stock bricks in CM 1:6 at all lifts, including scaffolding, curing, raking out joints complete as per specification and drawings from below ground level to roof level. Upto 3.00 m height.In Normal area | 8.0 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054