- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Numaligarh Refinery Limited
- >
NTID 44953463
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowAnnual Maintenance Contract Fo in Golaghat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Maintenance Contract Fo" in Golaghat, India.
- Opening Date : Wed 6th May, 2026
- Closing Date : Tue 5th May, 2026
- ₹ 0.00
- NTID 44953463
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
907000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 20 | Total Qty : 64510
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Thickness of Insulation: Less than 75 mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by providing & fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) Contractor has to make his own arrangement for procurement and storage of all the materials. 2) This item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. | 4100.00 | M2 |
| 2 | Thickness of Insulation: Less than 75 mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) NRL will issue LRB mineral wool mattresses on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. | 1250.00 | M2 |
| 3 | Thickness of Insulation: From 75 mm upto to 124mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by providing & fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) Contractor has to make his own arrangement for procurement and storage of all the materials. 2) This item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. | 9250.00 | M2 |
| 4 | Thickness of Insulation: From 75 mm upto to 124mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) NRL will issue LRB mineral wool mattresses on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. | 1750.00 | M2 |
| 5 | Thickness of Insulation: 125 mm and above: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by providing & fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) Contractor has to make his own arrangement for procurement and storage of all the materials. 2) This item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. | 2650.00 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054