NTID 42874650
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowAnnual Contract For Operation in Krishnapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Contract For Operation " in Krishnapur, India.
URBAN DEVELOPMENT DEPARTMENT
Krishnapur, West Bengal, India
NTID 42874650
- Opening Date : Mon 15th December, 2025
- Closing Date : Sat 13th December, 2025
- ₹ 6820434.00
- NTID 42874650
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
136409.00 -
Document Cost
Refer Documents -
Estimated Cost
6820434.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | CORRIGENDUM | BOQ |
BOQ Items Total Items : 26 | Total Qty : 5852
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Operation with daily routine Running Maintenance(minor) to ensure trouble free run of raw water pumping station of capacity 6 MGD containing 7 (seven) nos. different capacity raw water pumps & 3 (three) nos. recirculation pump of different capacity and control panel to run the unit in smooth and uninterrupted operation incl. collection of flow meter reading two times daily at inlet and outlet and as will be instructed by the EIC along with operation of valves and other related work etc. by deploying one no semi skilled operator & two nos unskilled helper for pump operator in each shift & engaging casual labour for cleanig Pump bay & sump. | 730 | Per shift |
| 2 | Operation with daily routine Running Maintenance(minor) to ensure trouble free run of primary clarifier pond and sludge pumping station (of primary clarifier) minor running maintenance of clarifier pond including detrietor and clarifier bridge with central gearing mechanism and sludge suction mechanism. Sludge pumping station (of primary clarifier) containing 3 (three) nos. 5 HP sludge lifting centrifugal pump & 1 (one) no. water lifting pump of different capacity and control panel to run the unit in smooth and uninterrupted operation as will be instructed by the EIC along with operation of valves and other related work etc. by deploying necessary atleast one no.semi skilled operator and one helper(Unskilled) in a shift & necessary casual Labour to clean pump bay. | 730 | Per Shift |
| 3 | Operation with daily routine Running Maintenance(minor) to ensure trouble free run of primary and secondary detrietor and sand pumping station containing 1 (one) no. detrietor, 2 (two) nos. sand pump of 3 HP capacity including 1 (one) no. bucket elevator for each unit sand collecting mechanism to run the unit in smooth and uninterrupted operation as will be instructed by the EIC along with operation of Gates , by deploying atleast one no. operator(semi -skilled),two nos. helper(unskilled) in a shift along with casual labour or sweeper to clean gate gratings and extract from detriator. | 730 | per shift |
| 4 | Operation with daily routine Running Maintenance(minor) to ensure trouble free run of Trickling Filter (Bio-filter) including its central bearing mechanism and jet propulsion mechanism by 3 (three) nos. recirculation pump of different capacity and Secondary clarifier pond and minor running maintenance of clarifier pond including detrietor and clarifier bridge with central gearing mechanism and sludge suction mechanism to run the unit in smooth and uninterrupted operationoperation as will be instructed by the EIC along with other related work etc. by deploying one nos. Un-skilled Helper in a shift & Casual labour to clean water outlet and Pocket of the arm. | 730 | Per shift |
| 5 | Operation with daily routine Running Maintenance(minor) to ensure trouble free run of sludge pumping station (of secondary clarifier) containing 2 (two) nos. 5 HP sludge lifting centrifugal pump and control panel to run the unit in smooth and uninterrupted operation as will be instructed by the EIC along with operation of valves and other related work etc. by deploying ONE NO. semi -skilled operator in a shift& casual labour for necessary cleaning.. | 730 | Per shift |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054