Tender for Public Works Department - NTID 31480953
Public Works Department
Bharatpur, Rajasthan, India
NTID 31480953
- Opening Date : Tue 30th May, 2023
- Closing Date : Mon 29th May, 2023
- ₹ 140669000.00
- NTID 31480953
Widening And Strengthning Work Of Nadbai To Halena Road Km 0/0 To 10/0.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2813380.00 -
Document Cost
5000.00 -
Estimated Cost
140669000.00
BOQ Items Total Items : 57 | Total Qty : 293531.599
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of light jungle | 6.72 | Hect. |
2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, scaking serviceable and unserviceable materials separately as per MoRTH specification claue : 202 By Mechanical Means Bituminious Course. | 1653.00 | Cum |
3 | Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Cement Concrete plain 1:3:6 mix. | 2256.00 | Cum |
4 | Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Dismantling stone masonry Rubble stone masonry in cement mortar | 318.272 | Cum |
5 | Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). In Hard soil mechanically using bull dozer, F.E. loader and carriage upto 1 km by tipper/dumper. | 19698.40 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane