Tender for Department of Rural Development and Panchayats - NTID 31489016
Department of Rural Development and Panchayats
Ariyalur, Tamil Nadu, India
NTID 31489016
- Opening Date : Thu 6th April, 2023
- Closing Date : Thu 6th April, 2023
- ₹ 2720000.00
- NTID 31489016
Strengthening Of The Road At T.naduveli Samathuvapuram Streets In Thathanur Panchayat Of Jayankondam Block In Ariyalur District Under Samathuvapuram 2022-23
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
28000.00 -
Document Cost
Refer Documents -
Estimated Cost
2720000.00
BOQ Items Total Items : 9 | Total Qty : 9769.1
# | Item | Quantity | Units |
---|---|---|---|
1 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1220.00 | Sqm |
2 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods,sectioning,ramming etc., complete as directed by the dept. officers for formation.(SI. No.61) Drain & Deposited on berms | 878.40 | Cum |
3 | Spreading the collected US Gravel 100 mm thick watering and hand roller rolling including cost and supply of US gravel from approved quarry and stacking to Departmental Gauge for pre measurements etc., complete as per standard specifications and as direct | 73.20 | Cum |
4 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER | 274.50 | Cum |
5 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 3660.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane