Tender for Yamuna Expressway Industrial Development Authority - NTID 31432692
Yamuna Expressway Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 31432692
- Opening Date : Tue 11th April, 2023
- Closing Date : Mon 10th April, 2023
- ₹ 59142787.00
- NTID 31432692
Resurfacing Work On 60mtr Wide Road Lhs (ch.22.50km To 27.00km) Along Yamuna Expressway, Yea
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1183000.00 -
Document Cost
1770.00 -
Estimated Cost
59142787.00
BOQ Items Total Items : 11 | Total Qty : 109743
# | Item | Quantity | Units |
---|---|---|---|
1 | Wet mix macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam precification including premixing the material with water OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Technical Specification Clause 406 of (MORTH/A.R./YEIDA/Based on UPPWD/SOR-2020) | 162.3200 | Cum |
2 | Providing and applying tack coat On prepared surface with bitumen VG-10 using bitumen perusser distributer and spraying on bitumen boiler including cleaning, preparing the existing road surface as per specifications at the rate of 0.25 kg per sqm. (MORTH/A.R./YEIDA/Based on UPPWD/SOR-2020) | ||
3 | On granular base such as WBM and WMM surface with 2.50Kg of bitumen VG-10 for 10Sqm | 100419.0000 | Sqm |
4 | Providing and laying dense graded bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment rolling with smooth wheeled achieve the desired compaction as per moRTH specification 505 respects. (MORTH/A.R./YEIDA/Based on UPPWD/SOR-2020) | ||
5 | 50mm compacted thickness with bitumen penetration of VG-30 | 2636.0000 | Cum |
Purchase Access To Download Selected Documents
₹ 200