Description
Repair/replacement Of Flooring, Plastering And Certain Others Works Of Offrs/jcos/or Md Accn At Mil Stn Gayamd Accn At Mil Stn Gaya
BOQ Items Total Items : 55 | Total Qty : 3118
# | Item | Quantity | Units |
---|---|---|---|
1 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc complete all as specified and directed. | 10.00 | Cum |
2 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed. | 2.00 | Cum |
3 | Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided for complete all as specified and directed. | 1.00 | Cum |
4 | Dismantling structural steel work including doors, gates, grills but excluding framed truss etc complete. | 2.00 | Qtl |
5 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including cleaning or refixing or removal to Store measured overall as fixed along the centre line over fittings and accessories) complete. | 60.00 | RM |
