Tender for DEPARTMENT OF POWER DEVELOPMENT - NTID 30680293
DEPARTMENT OF POWER DEVELOPMENT
Jammu, Jammu and Kashmir, India
NTID 30680293
- Opening Date : Wed 15th February, 2023
- Closing Date : Mon 13th February, 2023
- ₹ 1408000.00
- NTID 30680293
Renovation / Repair Of Control Room Building Complex Along With Sub-division Office Building At 150 Mva 132/33 Kv Grid Station Miran Sahib
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
28200.00 -
Document Cost
1000.00 -
Estimated Cost
1408000.00
BOQ Items Total Items : 67 | Total Qty : 16920.66
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil: | 76.13 | Cum |
2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level with:-1:5:10 (1cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size). | 14.62 | Cum |
3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: Plum Cement Concrete 1:3:6 as (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Boulders | 27.73 | Cum |
4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1 :3 (1 cement: 1 coarse sand: 3 graded stone aggregate 20 mm nominal size). | 5.07 | Cum |
5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level with:-1:2:4 | 2.63 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane