Renewal Of Haidargarh Mahrajganj Raebareli Road In Km.- 11, 13, 14, 15, 19, 23, 24, 46
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1380000.00 -
Document Cost
2360.00 -
Estimated Cost
23600000.00
BOQ Items Total Items : 4 | Total Qty : 58972
# | Item | Quantity | Units |
---|---|---|---|
1 | Providing and applying tack coat with bitumen VG-10 using Bituman sprayer at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom.(Including all material, labour & T&P with all taxes complite but excluding GST) | 54152.00 | Sqm |
2 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Including all material, labour & T&P with all taxes complite but excluding GST) | 90.00 | Cum |
3 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.(Including all material, labour & T&P with all taxes complite but excluding GST) | 1730.00 | Cum |
4 | Construction of subgrade and earthern Shoulder with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2. (Carted Earth) | 3000.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane