Tender for Directorate of Town Panchayats - NTID 32206062
Directorate of Town Panchayats
Villupuram, Tamil Nadu, India
NTID 32206062
- Opening Date : Fri 16th June, 2023
- Closing Date : Thu 15th June, 2023
- ₹ 1147810.00
- NTID 32206062
Removal Of Historical Garbage Waste Dumped At Solid Wastage Dumping Yard Site By Bio Mining Process In Manalurpet Town Panchayat
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
11478.00 -
Document Cost
Refer Documents -
Estimated Cost
1147810.00
BOQ Items Total Items : 1 | Total Qty : 1809
# | Item | Quantity | Units |
---|---|---|---|
1 | (a) Excavation the existing mixed compacted Garbage which underwent biological degradation in the land portion allocated / earmarked by Thiyagdurgam Town Panchayat Compost Yard and spraying with microbial innoculam for sanitizing and stabilizing the excavated mass sieving them using Mechanical Seiving machine or any other equipment at the cost of the Bidder. b) Stabilization of the open land fill site (c) Control of mal outdoor using Deodorizing agent and stabilizing the waste using Bio Culture for aerobic composting using industrial sprayer (d) Eco friendly and non pollution process in order to reduce the impact of dumping site in the adjacent areas (e) Excavating the soil wich lost its stability due to Garbage Dumping with Necessary Dewatering Works in the portion of the land earmarked (f) Segregate the excavated garbage in the land portion earmarked, into as many kind and categories as possible at the cost of the Bidder including cost of any power or fuel consumption (g) Selling, diverting for recycling marketing and recycling the excavated materials with in seven Days of Segregation with out any accumulation in the storage facility at the project site. (h) Creation and maintenance of infrastructure facilities and amenities at Bidder s risk and cost, for sieving, the excavated garbage, storing the segregation materials before Selling / Tacking out them from the project site (i) Deployment of necessary manpower, materials, equipments tools and construction of plants and sheds and creation of facilities for handling, separating, segregation and storing and weighing facilities for the operation of the plant and using only covered body Vehicles for the transportation of Materials. (j) Create all facilities and Make arrangements for controlling the emission , pollution and contamination of environment including atmosphere, air, water and earth including control of dust and noise pollution. | 1809.00 | 1.00 MT (One Metric Ton ) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane