Improvement Of Shyamal To Anala Road Such As Widening Of Concrete Road And Construction Of Drain From 7/456km To 7/676km And 11/400km To 11/850km In The District Of Dhenkanal Under State Plan For The Year 2022-23

Tendering Authority: GOVERNMENT OF ORISSA

India, Odisha, Dhenkanal

NTID

29253254

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items Total Items : 15 | Total Qty : 8818.65
# Item Quantity Units
1 Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Clause 201 of MoRT&H Specifications for Road and Bridge works (latest Revision) & including cost of all labour, T&P, etc. complete and as per direction of Engineer-in-charge. 4020.00 Sqm
2 Earthwork in excavation for road way in all kinds of soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, setting out, dressing of section to correct line, level, grade and camber transporting to embankment site within all lifts and lead upto 1000mtr., utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. 600.00 Cum
3 Providing & laying sub-base with Moorum in layers not exceeding 225mm watering and compacting to the required density in O.M.C with Vibratory Roller including cost and conveyance of sub base materials as per Clause 408 & 901 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.(For Shoulder) 547.00 Cum
4 Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers , watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Clause 401 and 304 of MoRT&H Specifications for road & Bridge works(latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. 645.44 Cum
5 Construction of Dry Lean Cement Concrete sub-base by semi-mechanized method over a prepared subgrade with coarse and fine aggregate confirming to IS:383,the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1 ,aggregate gradation after blending to be as per table 600.1 ,cement content not to less than 150 kg/cum , optimum moisture content to be determined during trial length construction ,concrete strength not to be less than 10 Mpa at 7 days,mixed in a batching plant ,transported to site,laid with a paver and compacting with vibratory roller,finishing and curing as per clause 601 of MoSRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge. 368.04 Cum