Tender for Varanasi Development Authority - NTID 30812832
Varanasi Development Authority
Varanasi, Uttar Pradesh, India
NTID 30812832
- Opening Date : Wed 22nd February, 2023
- Closing Date : Tue 21st February, 2023
- ₹ 0.00
- NTID 30812832
Development Work And Dismantling Of Well Infront Of Plot No A-87 And 88 In Pocket-a At Lalpur Scheme Phase-i Varanasi.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
3000.00 -
Document Cost
1430.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 7 | Total Qty : 222
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling of cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by E/I with in a distance of 60 meter. (SOR 2020 SI No. 697) | 44.00 | Sqm |
2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/I with in a distance of 60 meter. (SOR 2020 SI No. 692) | 6.00 | Cum |
3 | Earth workin cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding 1/2 meter (20'') in depth and earth work in enbankment to be in 20cm (8'') layers , including ramming and dressing the surface to requied levels and slopes and also including 1.5m (5') lift and 30m (100') lead.the earth from cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the E/I and cartage of 8km. ballat,kankar,coal,grit or sand etc. including loading and unloading but excluding stacking on pucca roads. [PWD SOR 2020- 253+231(a)] | 22.00 | Cum |
4 | Sand filling in well including supply of necessary quantity of sand from a distance not exceeding 8 km from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&O etc, required for proper completion of the work. (SOR 2020 SI No. 255) | 2.00 | Cum |
5 | Earth workin cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding 1/2 meter (20'') in depth and earth work in enbankment to be in 20cm (8'') layers , including ramming and dressing the surface to requied levels and slopes and also including 1.5m (5') lift and 30m (100') lead.the earth from cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the E/I. (SOR 2020 SI No.- 253) | 30.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane