Tender for KERALA WATER AUTHORITY - NTID 31359251
KERALA WATER AUTHORITY
TALIPARAMBA, Kerala, India
NTID 31359251
- Opening Date : Wed 5th April, 2023
- Closing Date : Tue 4th April, 2023
- ₹ 0.00
- NTID 31359251
Desilting Of Open Well, Construction Of Ohsr, Oh Platform For Synthetic Water Tank, Construction Of Truss And Maintenance Of Pump House, Supplying And Errection Of Pumpset, Supplying And Laying Gi Pumping Main And Distribution
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
2760.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 99 | Total Qty : 39072.257
# | Item | Quantity | Units |
---|---|---|---|
1 | Desilting and maintenance of Open Well | ||
2 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 105.000 | sqm |
3 | 100.54.3.5:Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 62.651 | cum |
4 | 100.7.3:Bailing out water with engine and pump set above 10HP up to 20HP including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 666.000 | Kwh |
5 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 666.000 | Kwh |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane