Tender for West Bengal State Police Housing Corporation Limited - NTID 31397494
West Bengal State Police Housing Corporation Limited
Arambagh, West Bengal, India
NTID 31397494
- Opening Date : Mon 3rd April, 2023
- Closing Date : Sat 1st April, 2023
- ₹ 912494.00
- NTID 31397494
Day To Day Operation And Maintenance Of Pump Motor Set Along With Electrical Maintenance At Arambagh Ps, Women Ps, Hoogly Rural Sp Office At Kamarkundu (356 Days) From 10.04.2023 To 31.03.2024. (1st Call)
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18250.00 -
Document Cost
Refer Documents -
Estimated Cost
912494.00
BOQ Items Total Items : 2 | Total Qty : 1099
# | Item | Quantity | Units |
---|---|---|---|
1 | Electromechanical works related to pumpmotor & Electrical maintenance works as required. Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess) ( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of PWD schedule of rates & as per the Annexure - 'A' for non-schedule items.) | 1.000 | LOT |
2 | Day to day Operation of pump- motor sets and Emergent EI maintenance works Supply of Manpower for operation of pump-motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works and Repair, Maintenance of electrical installation,if required for a period of 366 days as per direction of EIC. at location a) Arambagh PS, Women PS , Arambagh EF Line, SDPO Arambagh Shift Duration:- I) 06:00A.M to 2:00 P.M and 2:00 PM to 10:00 P.M ( One Number Semi Skilled Electrician Cum Pump Operator per shift) Electrician Cum Pump Operator ( Semi Skilled) =(2x366x1 )= 732 ** { Shift x Days x Man Power} b) Hoogly Rural SP office, Women PS, Cyber PS & Singur Police Line Shift Duration:- I) 10:00A.M to 6:00 P.M ( One Number Semi Skilled Electrician Cum Pump Operator per shift) Electrician Cum Pump Operator ( Semi Skilled) =(1x366x1 )=366 ** { Shift x Day x Man Power} Total (732+366) =1098.00 Shift is to be provided by the agency (minimum tools and tackles should be provided by the agency) ( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS ) | 1098.000 | Per Shift per Electrician Cum Pump Operator |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane