- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of BHABHA ATOMIC RESEARCH CENTRE
- >
NTID 40502314
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Renovation Of Ce in Mumbai – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Renovation Of Ce" in Mumbai, India.
BHABHA ATOMIC RESEARCH CENTRE
Mumbai, Maharashtra, India
NTID 40502314
- Opening Date : Thu 26th June, 2025
- Closing Date : Mon 23rd June, 2025
- ₹ 22978000.00
- NTID 40502314
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
542281.00 -
Document Cost
Refer Documents -
Estimated Cost
22978000.00
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | CorrigendumNo.1 | Date |
BOQ Items Total Items : 231 | Total Qty : 26940.8
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge (a) From 0.00 to 1.50 m depth from Average Ground Level | 100 | CuM |
2 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge (a) From 1.50 to 3.00 m depth from Average Ground Level | 30 | CuM |
3 | Lead charges for lead exceeding 3 KM but Not exceeding 4 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Note: The rates in respect of Item Nos 5 is applicable for NET Quantities arrived at after making deduction for voids @ 20% in respect of soil and @ 30% in respect of debris from corresponding STACK / TRUCK Measurement | ||
4 | Soil | 100 | CuM |
5 | Debris | 100 | CuM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054