- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
- >
NTID 39161203
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Rejuvenation And, Kolkata - Tender Details
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
Kolkata, West Bengal, India
NTID 39161203
- Opening Date : Fri 28th March, 2025
- Closing Date : Wed 26th March, 2025
- ₹ 0.00
- NTID 39161203
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1000000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 68 | Total Qty : 1474
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply, delivery , storage, installation, testing & commissioning of 4 panel HT VCB switch board , having voltage level 6 KV , at 50 Hz, with fault level 40 KA to complete as per technical specification and direction of EIC. | 1.000 | set |
2 | Supply, delivery, installation of LT PDB for Substation in view of supplying power to the PMCC at annex building , keeping provision for feeding the plant by partially loading both the transformer or from a single transformer if required to complete . The new panel will be able to cater all the existing outgoing loads of the old panel. The new panel has to be designed keeping in mind that it should fit in the space of the Old Panel. | 1.000 | set |
3 | Supply , delivery ,storage, installation of 110 Volt , DC, 100 AH sealed maintenance free battery comprising of 55 no 2 volt cells with float cum boost battery charger cum DCDB panel as per specification, technical offer and as directed by EIC. | 1.000 | job |
4 | Supply, delivery, installation of LT PMCC for Annex Building as per existing LT Panel. The new panel will be able to cater all the existing outgoing loads of the old panel including blower motor feeders, backwash pump feeders, surface wash pump feeders, flash mixtures, agitators etc. to complete as per direction of EIC and technical specification. The new panel has to be designed keeping in mind the available space in the existing building. | 1.000 | set |
5 | Supply, delivery, installation of LT PMCC for Chemical House as per existing LT Panel. The new panel will be able to cater all the existing outgoing loads of the old panel including alum tank filling pumps and agitators etc.as per direction of EIC. The new panel has to be designed keeping in mind the available space in the existing building. | 1.000 | set |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054