PUBLIC HEALTH ENGINEERING DEPARTMENT
Parganas, West Bengal, India
NTID 39013460
Opening Date : Mon 10th February, 2025
Closing Date : Fri 7th February, 2025
- ₹ 0.00
- NTID 39013460
Corrigendum : Overhauling And Calibration Of 11kv Breaker, Transformer And Other At Sub-station Equipments Including Pdb And Mcc Of Dps-iiid Of Aa-iii Under Ntk Project.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5000.00 -
Document Cost
250.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 8 | Total Qty : 2669
# | Item | Quantity | Units |
---|---|---|---|
1 | For HT panel: Thorough testing and calibration of 11KV VCB 3 Panel distribution board at site: A) Disconnection of 11KV HT cables. B) Cleaning of entire panel by carbon cleaner to remove all carbon particles. C) Cleaning of all dismantled components to remove all carbon particles and sulphation to improve insulation resistor (IR). D) 11KV Breaker completely servicing, cleaning by CRC & checking of all parts and make it in proper condition. E) Cable and termination to be cleaned by carbon cleaner. F) After servicing of all switch gear & checking its IR with respect to earth and phase to phase, they are racked in service position & kept at ON condition. At this condition High Voltage testing. G) All over current and earthfall relays tested by secondary injection. H) IR value checking of PT & CT. I) Tripping test of Breaker by primary injection. J)After testing all the HT cables (11KV) reconnected for successfully charging of 11KV supply on put on load condition. For LT PDB panel: A) Thorough cleaning of entire PDB panel & lighting. B) Testing & servicing of Air Circuit Breaker C) Testing of all MCCB, SFU, CT etc. D) All tightness checking. For LT MCC panel: A) Thorough cleaning of entire MCC panel & lighting. B) Motor Protection Relay Setting Checking C) Testing of all MCCB, MCB, Contactor, SFU, CT etc. D) Water Level Sensor And Interlocking With Motor Checking E) All tightness checking. For Transformer: IR/PI Value, Ratio checking, Oil lekage, Relay setting and others as per Annexure. For Battery Charger: Thorough Overhauling of battery charger, De-sulpheriztion & maintenance of battery (Report should be submitted as per Annexure I, II, III & IV) | 1.000 | ITEM |
2 | Dehydration & filtrtation of 2 nos. 11/0.433KV 1600 KVA transformer oil of the existing trasnformer (2 x 1330) = 2660 Ltrs. [Make : ANDREWYULE] | 2660.000 | LTR. |
3 | Dielectric strength test as per specification of the IE rules (2 nos 1600KVA transformer). | 2.000 | SETS |
4 | Transportation charges of filtration machine (to & fro). | 1.000 | ITEM |
5 | Supply & reflling of Silica gel. | 3.000 | KG |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.