- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Industries and Commerce Department
- >
NTID 40423079
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Lmc last Mile C in Guwahati – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Lmc last Mile C" in Guwahati, India.
- Opening Date : Mon 16th June, 2025
- Closing Date : Mon 16th June, 2025
- ₹ 0.00
- NTID 40423079
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2100000.00 -
Document Cost
20000.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | BOQ | BOQ |
2 | Corrigendum 01 | Date |
3 | RTBQ | Technical Bid |
BOQ Items Total Items : 84 | Total Qty : 205994
# | Item | Quantity | Units |
---|---|---|---|
1 | GA 11.03 ASSAM | ||
2 | SONITPUR (SEGMENT-1) | ||
3 | Laying of MDPE pipe line in all types of surface using any laying Methodology | ||
4 | MDPE Pipe line laying in all type of surface using any laying methodology | ||
5 | Pipe Laying in any unprepared surface (Katcha surface) / Normal Surface / Hard surface/Hard rock using open cut methodology or Manual Moling Technique (with/without casing) . Loading, storing, unloading and laying of PE100 SDR11 line pipes of size 20 mm/32 mm dia including proper stacking, identification, and supply of accessories of all sizes & thickness like PE Bends, Couplers, End caps, Tee, Reducer, Warning Mat, GI sleeves etc.. Handling, Stringing/ uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use/ route, laying/ installation of PE line pipe along with required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of all materials in contractor's designated store, fabrication, access to construction; procurement and supply of all materials, consumables, equipments, labour and other inputs. The scope also includes, receiving and loading from NEGDCL designated store, transportation, unloading and stacking of free issue items such as PE Pipelines at Contractor's store. Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Carrying out preliminary activities such as preparation of drawings wherever required for crossing etc. Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Engineer -in- charge, installation of safety signs. Note: PE Pipelines shall be Free Issue Material |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054