Inquiry NowCorrigendum Levellling And D in Pushkar – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Levellling And D" in Pushkar, India.
- Opening Date : Thu 26th June, 2025
- Closing Date : Wed 25th June, 2025
- ₹ 151130000.00
- NTID 40598977
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
3022600.00 -
Document Cost
10000.00 -
Estimated Cost
151130000.00
BOQ Items Total Items : 17 | Total Qty : 4613412.28
# | Item | Quantity | Units |
---|---|---|---|
1 | Site clearance including uprooting of rank vegetation, bushes, woods, trees and sapplings of girth upto 150mm and removal of rubbish etc. complete. | 860900 | Per Sqm |
2 | Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper. Earth work in embankement construction, side slopes etc. including compaction in 200 mm thick loose layers and dressing (MoRTH specification clause : 305.3.5) by manual means with all lead and lift but excluding watering and rolling. Deduction for kaccha nallah | 2100000.00 | Cum |
3 | Add extra over Item No. 3.1 to3.4 for earthwork in embankement construction,side slopes etc. including compaction in 200mm thick loose layer sand dressing (MoRTH specification clause:305.3.5) by manual means with all lead and lift but excluding watering and rolling. | 400000.00 | Cum |
4 | Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 _____do___________ with lead 500mtr to 1000 mtr | 200000.00 | Cum |
5 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling filling part cutting part | 500000.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054