- Home
- >
- Tender
- >
- Pondicherry Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 40104874
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Greenspace Devel in Pondicherry – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Greenspace Devel" in Pondicherry, India.
MUNICIPAL CORPORATION
Pondicherry, Pondicherry, India
NTID 40104874
- Opening Date : Fri 16th May, 2025
- Closing Date : Fri 16th May, 2025
- ₹ 0.00
- NTID 40104874
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
44000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | Due Date Extended for tenders closing on 07-05-2025. | Admin Corrigendum Date Extend |
2 | Due Date Extended for tenders closing on 07-05-2025. | Admin Corrigendum Date Extend |
3 | Tender Date Extension | Date |
BOQ Items Total Items : 76 | Total Qty : 9500
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - Narrow Foundations - Upto 2.00m Depth | 124.00 | m3 (One Cubic Metre) |
2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - Open Earth Work Excavation | 35.00 | m3 (One Cubic Metre) |
3 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 86.00 | m3 (One Cubic Metre) |
4 | Plain Cement Concrete 1:4:8 (one cement, four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 24.00 | m3 (One Cubic Metre) |
5 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Drain side | 203.00 | m2 (One Square Metre) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054