- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Department Of Water Resources
- >
NTID 39938702
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Estimate For Lay in Ropar – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Estimate For Lay" in Ropar, India.
- Opening Date : Mon 16th June, 2025
- Closing Date : Mon 16th June, 2025
- ₹ 921476.00
- NTID 39938702
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | date extend | Date |
2 | Regarding culture cess | Other |
3 | ddate exxtend | Date |
4 | Regarding culture cess | Other |
5 | date extend | Date |
6 | Regarding culture cess | Other |
7 | date postpone | Date |
8 | Regarding culture cess | Other |
9 | date postp one | Date |
10 | Regarding culture cess | Other |
11 | date post pone | Date |
12 | Regarding culture cess | Other |
13 | date postpon e | Date |
14 | Regarding culture cess | Other |
15 | date pos tpone | Date |
16 | Regarding culture cess | Other |
17 | date postpo ne | Date |
18 | Regarding culture cess | Other |
19 | DATE | Date |
20 | Regarding culture cess | Other |
21 | DATE EXT END | Date |
22 | Regarding culture cess | Other |
23 | DATEe | Date |
24 | Regarding culture cess | Other |
25 | ddate e xxtend | Date |
26 | Regarding amendment in description and quantities of items and cost of work | Other |
27 | date post pon e | Date |
28 | Regarding amendment in description and quantities of items and cost of work | Other |
29 | new date | Date |
30 | Regarding amendment in description and quantities of items and cost of work | Other |
31 | new date | Date |
32 | Regarding amendment in description and quantities of items and cost of work | Other |
33 | Date Extend | Date |
34 | Regarding amendment in description and quantities of items and cost of work | Other |
35 | date postpone | Date |
36 | Regarding amendment in description and quantities of items and cost of work | Other |
37 | date postpone | Date |
38 | Regarding amendment in description and quantities of items and cost of work | Other |
39 | DATE e | Date |
40 | Regarding amendment in description and quantities of items and cost of work | Other |
BOQ Items Total Items : 22 | Total Qty : 22
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 mtr. | 1.00 | cum |
2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. -Depth upto 1.5 to 2.25mtr. | 1.00 | cum |
3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1.00 | cum |
4 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1.00 | sqm |
5 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1.00 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054