ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Construction Wor, Kushinagar - Tender Details
Explore tender information for Corrigendum Construction Wor in Kushinagar, including eligibility, deadlines, and bid specifics.
Public Works Department
Kushinagar, Uttar Pradesh, India
NTID 38753222
Opening Date : Thu 20th March, 2025
Closing Date : Thu 20th March, 2025
- ₹ 7860000.00
- NTID 38753222
Corrigendum : Construction Work Of Pitch Road From Sadiq Miya S House In Jungle Kurmaul Of Padrauna Mansa Chhapar Via Bakulha Minor Track To Nahar Chhapra Musahar Tola In Dist Kushinagar.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
593000.00 -
Document Cost
2950.00 -
Estimated Cost
7860000.00
BOQ Items Total Items : 7 | Total Qty : 1087
# | Item | Quantity | Units |
---|---|---|---|
1 | (Construction of Embankment with Material obtained from Right of Way) Construction of embankment with approved material obtained from Right of Way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Excluding GST) | 2,500.00 | Cum |
2 | (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification Clause 401(Excluding GST) | 150.00 | Cum |
3 | Providing,laying and spreding material on a prepared Sub grade adding cement @ 2% by wet to the spred material manually mixing in aplace Rotavator and compcting with the road roller at OMC to achive the desired unconfined Compressive strength and to form a Layer of Sub Base.. (Excluding GST) | 430.00 | Cum |
4 | Providing,laying and spreding material on a prepared Sub Base, cement @ 4% by wet to the spread material manually mixing in place Rotavator and compcting with the road roller at OMC to achive the desired unconfined Compressive strength and to form a Layer of Base. (Excluding GST) | 490.00 | Cum |
5 | Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10)(Excluding GST) | 5,437.50 | sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054