- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Hindu Religious and Charitable Endowments Department
- >
NTID 40455210
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Villupuram – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Villupuram, India.
Hindu Religious and Charitable Endowments Department
Villupuram, Tamil Nadu, India
NTID 40455210
- Opening Date : Tue 24th June, 2025
- Closing Date : Tue 24th June, 2025
- ₹ 7326962.00
- NTID 40455210
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
46700.00 -
Document Cost
Refer Documents -
Estimated Cost
7326962.00
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | Time extention for next one weeks | Date |
2 | Time extention for next one week | Date |
BOQ Items Total Items : 90 | Total Qty : 6348.08
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 123.00 | M3 |
2 | Supplying and FILLING GRAVEL Supplying and filling in 'foundation and basement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. | 31.20 | M3 |
3 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 13.65 | M3 |
4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 28.00 | M3 |
5 | Supplying and erecting shuttering for sides and soffits including necessary supports for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding with minimum support etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 114.00 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054