- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Maharashtra Industrial Development Corporation
- >
NTID 39867281
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Pune – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Pune, India.
Maharashtra Industrial Development Corporation
Pune, Maharashtra, India
NTID 39867281
- Opening Date : Tue 8th July, 2025
- Closing Date : Sat 5th July, 2025
- ₹ 178123042.00
- NTID 39867281
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
890700.00 -
Document Cost
30680.00 -
Estimated Cost
178123042.00
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | Date Corrigendum | Date |
2 | Date Extension | Date |
BOQ Items Total Items : 117 | Total Qty : 187461.09
# | Item | Quantity | Units |
---|---|---|---|
1 | Laying and Jointing PVC Pipe. Heading | ||
2 | Sub-Estimate no I: Strengthening & upgradation to roads by Concretization Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto all leads. and spreading for embankment or stacking as directed. | 8900.000 | Cubic meter |
3 | Milling of existing bituminous surface to specified depth of bituminous layer including disposal of removed material with all lift and all leads etc complete. Using machine like Writgen (W100) or equivalent | 12000.000 | Square Meter |
4 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete | 480.000 | Cubic meter |
5 | Providing earth work in embankment with approved materials obtained from other sources upto all leads. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 6600.000 | Cubic meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054