ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Constructing Sul, Kolhapur - Tender Details
Explore tender information for Corrigendum Constructing Sul in Kolhapur, including eligibility, deadlines, and bid specifics.
PANCHAYAT SAMITI
Kolhapur, Maharashtra, India
NTID 38660673
- Opening Date : Fri 17th January, 2025
- Closing Date : Thu 16th January, 2025
- ₹ 2462075.00
- NTID 38660673
Corrigendum : Constructing Sullage Treatment Management At Terni Taluka-gadhinglaj,dist-kolhapur
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
24621.00 -
Document Cost
3600.00 -
Estimated Cost
2462075.00
BOQ Items Total Items : 21 | Total Qty : 3645.23
# | Item | Quantity | Units |
---|---|---|---|
1 | Name Of Work-ANAEROBIC BAFFLED REACTOR AND PLANT GRAVEL BED ( ROOT ZONE) FOR 186 CUM/D Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material up to a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) | 126.60 | Cum |
2 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd- A-2/259) | 122.60 | Cum |
3 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material up to a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) | 186.10 | Cum |
4 | Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) | 400.00 | Hp/hr |
5 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) Spec. No. - Bd E /1 Page No. 287 and B-7, Page No. 38 b) In PCC M-150 | 18.70 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054