- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Department Of Water Resources
- >
NTID 40001153
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Concrete Lining in Fazilka – Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Concrete Lining " in Fazilka, India.
- Opening Date : Mon 26th May, 2025
- Closing Date : Mon 26th May, 2025
- ₹ 21500000.00
- NTID 40001153
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
430000.00 -
Document Cost
20000.00 -
Estimated Cost
21500000.00
Latest Corrigendum List
# | Corrigendum Title | Corrigendum Type |
---|---|---|
1 | Corrigendum No.1/2025-26 | Date |
2 | Due Date Extended for tenders closing on 07-05-2025. | Admin Corrigendum Date Extend |
3 | Corrigendum No.1/2025-26 | Date |
4 | Due Date Extended for tenders closing on 07-05-2025. | Admin Corrigendum Date Extend |
5 | Corrigendum No.02/2025-26 | Date |
6 | Due Date Extended for tenders closing on 07-05-2025. | Admin Corrigendum Date Extend |
7 | Corrigendum No.03/2025-26 | Date |
BOQ Items Total Items : 81 | Total Qty : 81
# | Item | Quantity | Units |
---|---|---|---|
1 | Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with up to Discharge upto 1.5 cumecs | 1.00 | Km |
2 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m.(as per csr item no 6.19) cutting | 1.00 | Cum |
3 | Excavation of soil using hydralic excavator and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and lead but execluding royality | 1.00 | Cum |
4 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications | 1.00 | Cum |
5 | Dressing of Earthwork | 1.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054