- Home
- >
- Tender
- >
- Rajasthan Tender
- >
- Department of Deputy commissioner
- >
NTID 42761724
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Work Of Park At P in Anupgarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Work Of Park At P" in Anupgarh, India.
- Opening Date : Fri 28th November, 2025
- Closing Date : Thu 27th November, 2025
- ₹ 2496649.00
- NTID 42761724
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
49933.00 -
Document Cost
1000.00 -
Estimated Cost
2496649.00
BOQ Items Total Items : 21 | Total Qty : 10067.83
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK | ||
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 36.21 | cum |
| 3 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 1806.00 | cum |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 12.07 | cum |
| 5 | Brick work with modular bricks of class designation 75 in foundationand plinth in:Cement Mortar 1:6 (1 cement : 6 coarse sand). | 93.15 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054