Tender for Heavy Engineering Corporation Limited - NTID 30317764
Heavy Engineering Corporation Limited
Ranchi, Jharkhand, India
NTID 30317764
- Opening Date : Mon 13th February, 2023
- Closing Date : Sat 11th February, 2023
- ₹ 0.00
- NTID 30317764
Construction Of New Perimeter Wall
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
30000.00 -
Document Cost
7500.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 9 | Total Qty : 29098
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge (All kinds of soil) | 760 | cum |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 572 | cum |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:3:6 (1 cement : 3 manufactured sand derived from Recycled concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Aggregate (RA) ) | 151 | cum |
4 | Providing and laying in position ready mixed or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard settingof concrete, to improve durability and workability without impairingstrength; including pumping of concrete to site of laying, curing, carriagefor all leads; but excluding the cost of centering, shuttering, finishingand reinforcement as per direction of the engineer-in-charge; for theconcrete of M25 grade with minimum cement content of 330 kg /cum . | 635 | cum |
5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, columns, etc. for mass concrete | 6500 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane