Tender for GOVERNMENT OF ORISSA - NTID 30744302
GOVERNMENT OF ORISSA
Dhenkanal, Odisha, India
NTID 30744302
- Opening Date : Mon 20th February, 2023
- Closing Date : Sat 18th February, 2023
- ₹ 12917578.00
- NTID 30744302
Construction Of E Type Staff Quarters 6 Nos One Block At Government Womens College Dhenkanal.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
129200.00 -
Document Cost
10000.00 -
Estimated Cost
12917578.00
BOQ Items Total Items : 338 | Total Qty : 19872.96
# | Item | Quantity | Units |
---|---|---|---|
1 | CIVIL WORKS:- Earth work excavation in foundation trenches in hard soil including hard moorum stony earth mixed with stone and boulders (except sheet rocks and boulders required blasting) including dressing and leveling the bed up to required depth and depositing the excavated materials at places away from work site within 50mtr initial lead and 1.5mtr initial lifts T&P shoring shuttering dewatering if required etc. complete as per direction of the Engineer-in-charge. | ||
2 | (a)Upto 1.5mtr Depth | 178.21 | Cum |
3 | (b) Beyond 1.5mtr to 3.00 mtr Depth | 114.78 | Cum |
4 | Cement concrete of propertion (1:3:6) in foundation and floors using 40mm nominal size clean hard black cursher broken granite metal of approved quality from approved quarry including lowering laying concrete in layers not exceeding 15cm thick to the required level ramming watering curing centering & shuttering etc. complete including cost conveyance royalty taxes of all materials and all labour T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 68.94 | Cum |
5 | RCC work of M-20 in all floors having a minimum compressive strength ( in work test) 200kg/cm2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 10mm size to 20mm size black hard crusher broken granite stone chips (10mm size 40% & 20mm size 60%) of approved quality & from approved quarry including hoisting lowering laying and compacting concrete with centering & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary and providing required No. of fan hooks as required including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS rod / Tor steel and binding wire and labour charges for bending binding and tying the grills.(In all Floors) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane