Tender for Deputy commissioner - NTID 31327702
Deputy commissioner
SALUMBER, Rajasthan, India
NTID 31327702
- Opening Date : Wed 5th April, 2023
- Closing Date : Tue 4th April, 2023
- ₹ 1490000.00
- NTID 31327702
Construction Of Drain Byepass Bus Stand To Surajpole
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
29800.00 -
Document Cost
1000.00 -
Estimated Cost
1490000.00
BOQ Items Total Items : 9 | Total Qty : 2271.2
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m (4.10.1.1) | 370.00 | Cum |
2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.(9.3) | 80.00 | Cum |
3 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:6 (1 cement : 6 fine/ coarse sand) (32.1.2) | 250.00 | Sqm |
4 | Neat cement punning (32.9) | 250.00 | Sqm |
5 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars.(23.19.6) | 800.00 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane