Construction Of Bitumen Road From Aluminium Park To Kangula I/a Road From (ch-0/000.00 To Ch-0/888.00) Along The Right Side(from Aap To Smelter Plant) Of Molten Metal Road.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
60250.00 -
Document Cost
11800.00 -
Estimated Cost
6025192.00
BOQ Items Total Items : 6 | Total Qty : 9002.09
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of granular sub-base by providing Grading-II material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density with cost of all labour, material, conveyance, royality, machinery excluding GST etc. complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | 1332.00 | Cum |
2 | Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with Paver in sub-base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density with cost of all labour, material, conveyance, royality, machinery excluding GST etc. complete as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | 1332.00 | Cum |
3 | Providing and applying primer coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.60 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom including cost of all labour, material, conveyance, royality, machinery excluding GST etc. complete as per Clause 502 of MoSRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | 4884.00 | Sqm |
4 | Providing and laying Semi-dense graded bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a c paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including cost of all labour, material, conveyance, royality, machinery excluding GST etc. complete as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | 122.09 | Cum |
5 | Construction of shoulders with approved material (moorum) obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement including cost of all labour, material, conveyance, royality, machinery excluding GST etc as per table 300-2 & Clause 305 of MoRTH Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | 1332.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane