- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Bodoland Territorial Council
- >
NTID 40968866
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Bir Chilagang in Kokrajhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Bir Chilagang " in Kokrajhar, India.
- Opening Date : Tue 29th July, 2025
- Closing Date : Mon 28th July, 2025
- ₹ 47723710.00
- NTID 40968866
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
954474.00 -
Document Cost
10000.00 -
Estimated Cost
47723710.00
BOQ Items Total Items : 466 | Total Qty : 202735.193
# | Item | Quantity | Units |
---|---|---|---|
1 | 1.) PAVILION CUM COVER GALLERY G. FLOOR 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 410.990 | Cum |
2 | 2.25(a) Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 200.940 | Cum |
3 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 17826.080 | Kg |
4 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 38783.510 | Kg |
5 | 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 6533.260 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054