- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of URBAN DEVELOPMENT DEPARTMENT
- >
NTID 40970185
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 13 Nos Compost in South Tripura - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 13 Nos Compost" in South Tripura, India.
URBAN DEVELOPMENT DEPARTMENT
South Tripura, Tripura, India
NTID 40970185
- Opening Date : Mon 14th July, 2025
- Closing Date : Mon 14th July, 2025
- ₹ 1064600.00
- NTID 40970185
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21292.00 -
Document Cost
1000.00 -
Estimated Cost
1064600.00
BOQ Items Total Items : 15 | Total Qty : 2947.184
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 39.755 | cum |
2 | Supplying and filling in plinth, under floor, foundations etc.with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compactin geach layer by using plate compactor or by anymethod complete. | 16.143 | cum |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 12.768 | Cum |
4 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 17.253 | Cum |
5 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 135.02 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054