Inquiry NowConstruction Of 1250 Kld Capac in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 1250 Kld Capac" in Gorakhpur, India.
Uttar Pradesh Projects Corporation Limited
Gorakhpur, Uttar Pradesh, India
NTID 40969022
- Opening Date : Mon 14th July, 2025
- Closing Date : Mon 14th July, 2025
- ₹ 46066000.00
- NTID 40969022
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
921000.00 -
Document Cost
17700.00 -
Estimated Cost
46066000.00
BOQ Items Total Items : 195 | Total Qty : 33889
# | Item | Quantity | Units |
---|---|---|---|
1 | 1250 KLD STP (Civil Works) | ||
2 | Cleaning jungle including uprooting of rank vegetation grass , bush , wood tree and sapling of grith upto 30cm measured at a height of 1 m above level & removel of rubbish upto a distance of 50 m out side the ;eripheri of area cleared. | 1800.00 | SQM |
3 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 4728.45 | CUM |
4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 183.62 | CUM |
5 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 168.08 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054