Construction And Commissioning Of Fecal Sludge Treatment Plant Of Capacity 15 Kld At Bishrampur Town Palamau Jharkhand Followed By Operation And Maintenance Including Desludging Operations For 5 Years.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
428290.00 -
Document Cost
10000.00 -
Estimated Cost
42828993.00
BOQ Items Total Items : 281 | Total Qty : 86065.19
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in soil by manual means (Excavation for roadway in soil using manuyal means including loading in truck for carrying of cut earth to embankment site with all lifts and leads upto 1000meters.) | 447.00 | Cum |
2 | wet Mix Macadam (Providing, Laying, spreading and compacting graded stone aggregates to WMM specification including premixing the materials with vater at omc in mechanical mix plant carriage of mixed material by tipper to lsite, laying in uniform layers wi | 207.75 | Cum |
3 | cement Concrete pavement (construction of un-reinforced, dowel jointed, Plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 jg oer cum , coarse and fine aggregate confirming to IS: 383, maximum size of coarse aggregate no | 144.00 | Cum |
4 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil Item-A) and disposal of excavated earth as obtained to a distance up to 50M. Including all lifts with leveling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction of E\I. | 2907.59 | Cum |
5 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m and lift of 1.5 m all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 16.22 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane