Tender for Department of Rural Development and Panchayats - NTID 31450915
Department of Rural Development and Panchayats
TIRUVARUR, Tamil Nadu, India
NTID 31450915
- Opening Date : Wed 5th April, 2023
- Closing Date : Wed 5th April, 2023
- ₹ 3160000.00
- NTID 31450915
Block Toping To The Odachery Samathuvapuram Road In Odachery Panchayat Km 0/000 - 1/135 In Tiruvarur Block Of Tiruvarur District Under The Scheme Samathuvapuram 2022-23
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
31600.00 -
Document Cost
Refer Documents -
Estimated Cost
3160000.00
BOQ Items Total Items : 17 | Total Qty : 8348.43
# | Item | Quantity | Units |
---|---|---|---|
1 | Picking the existing damaged BT surface ,5 cm to 10 cm old metalled surface and sectioning | 1135.000 | m2 |
2 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | 76.950 | m3 |
3 | Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | ||
4 | Ch 0/0 -1/000 | 225.000 | m3 |
5 | Ch 1/0 -1/135 | 30.380 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane