Tender for Yamuna Expressway Industrial Development Authority - NTID 31456447
Yamuna Expressway Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 31456447
- Opening Date : Tue 18th April, 2023
- Closing Date : Mon 17th April, 2023
- ₹ 2871590.00
- NTID 31456447
Barbed Wire Fencing On Central Verge Of 45mtr Wide Road Near Plot No-a1 And A-8 In Sector 29 Yeida Wc-horti
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
57500.00 -
Document Cost
590.00 -
Estimated Cost
2871590.00
BOQ Items Total Items : 5 | Total Qty : 58777.97
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavating of holes more then 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5m. | 1873.0000 | nos |
2 | Providing and laying in position cement concrete with 4cm gauge stone ballast, coarse sand and cement in proportion 8:4:1 , including supply of all materials, labour, Tools & plant extra for proper completion of the work. (SOR item no 281/p-17) | 222.7400 | cum |
3 | Supply of R.C.C Standards post/struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 42.4200 | cum |
4 | Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. | 55540.8000 | rm |
5 | White Washing with lime to give and even shade. New work (Three or more coat | 1099.0100 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane