+91-9586587498
alliedgujarat@yahoo.co.in
Audi Expands Electric Motor Production At Győr, Hungary
India
Audi Expands Electric Motor Production At Győr, Hungary July 30, 2019 06:09:34PM 0.00

Posted on - July 30, 2019 06:09:34PM

July 30, 2019 06:09:34PM

Region : International

Single Post Image
Audi's plant in Győr, Hungary will produce more electric motors and a new generation of motors. Audi started series production of electric motors for the e-tron in Győr, Hungary about a year ago in July 2018. As electrification moves forward, the German manufacturer has announced the continuation of e-transformation. The Hungarian plant, which initially was able to produce 400 electric axle motors per day, will be expanded to produce more electric motors (no numbers were disclosed) and a new generation of electric motors. Moreover, the competencies and capacities of technical development also will be expanded. It's great news for Hungary, which secures 250 new jobs and long-term commitment from Audi.

Leave your comment

Please login to leave your comment.

ALLIED ELECTRIC ENGINEERING CO

The Allied Group has emerged as Leading Inventor, Innovator, and Implementer of Leading-Edge Technology enabled Solutions operating in the motors, Transformers, Electrical, Electronics Industrial Power Products. ALLIED ELECTRIC ENGINEERING CO. is established in 1954 at Bakarawadi, Dr. Ambedkar Road, Baroda, by taking up the repair of small types of electric Motors. Allied Brings State-of-the-Art Technology That Adds Value to Customers through a Combination of multiple high-end technologies for complete solutions. The Group has the competence and capability to integrate all products, systems, and services. Over the years thanks to enlightened management, the dedicated efforts of workers and the loyalty of customers that the company has grown up to become the most trusted name in electrical & electronics equipment repairing & servicing in Baroda. Now the company is capable to accept any challenging job in this filed. Our well-equipped workshop is situated at 358, G. I. D. C., Makarpura, Baroda - 390 010. The factory admeasures about 22,000 Sq. ft. area as Work Shop and Stores, with all modern facilities and machinery's for rewinding & repairing work.

Enquiry Now

Our Events

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
SUSU researchers develop digital twins for electric motors

Within the groundbreaking field of industrial digitization, researchers from South Ural State University are developing digital twins for electric motors for a big Russian industrial metallurgical company. These developments are unique and have no analogues in Russia or abroad. The results of their research were presented at Global Smart Industry Conference and published in a collection indexed in[..]

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
Audi Expands Electric Motor Production At Győr, Hungary

Audi's plant in Győr, Hungary will produce more electric motors and a new generation of motors. Audi started series production of electric motors for the e-tron in Győr, Hungary about a year ago in July 2018. As electrification moves forward, the German manufacturer has announced the continuation of e-transformation. The Hungarian plant, which initially was able to produce 400 electric axle [..]

Similar Events

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
Air compressor

Air-Compressor-Guide.com collects personally identifiable information from the visitors to our website only on a voluntary basis. Personal information collected on a voluntary basis may include name, postal address, email address, company name and te[..]

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
Education Avenues at 11-12 June in Pune 2016 in Pune

EDUCATION AVENUES AT 11-12 JUNE IN PUNE 2016 INNAGURAL SESSION ON – 11 JUNE 2016 AT GANESH KALA KRIDA KENDRA SWARGATE PUNE • STARTS AT 10.00 AM • GUEST OF HONOUR TO INNAGURATE THE EVENT WILL BE • Shri. KUNAL KUMAR – IAS- MUNCIPAL COMISSIONER -PUNE • Mrs. RASHMI SHUKLA- IPS- COMISSIONER OF POLICE – PUNE • Mr. SUSHIL MUHNOOT - CMD [..]

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
 CNC Laser Cutting

We are widely appreciated in the market as a service provider of CNC Laser Cutting service. Our standard quality CNC Laser Cutting service has huge demand in a number of industries like oil and gas sector, heating and cooling equipment manufacturing industry, engineering sector, medical arena, defense sector, packaging industry and construction materials manufacturing unit to name a few. We use pr[..]

Not a happy camper - by , April 1, 2011
1/ 5stars
The lamp burned out and now I have to replace it.
Sewage Submersible Pumps

Technical Specifications: Capacity: Up To 132 M /hr Head: Up To 50 Mtr. Temperature: 45 o C HP: 0.5 To 10 (1 To 2 HP In Single Phase) RPM: Up To 2880 Delivery Size: 25 mm To 100 mm Solid Size: 50 mm Connection: Dol Voltage & Phase: 415 V, 3 Phase / 215 V, 1 Phase Up To 2 HP Insulation / Protection: ‘F’ Class / ‘H’ Class - IP 68 Cable: PVC Insulated Double Seated Copper Conduc[..]

Tender InquiryInquiry