MODULAR WEIGHBRIDGE
by : National Tenders
Quantity : 0 1
Price : 0
Civil Work :
If you opt for our mobile weigh bridge with inbuilt steel foundation plates you don't require any civil foundation work. For the erection of the weighbridge only a well leveled hard surface is required. The savings accrued because of this are
a) Savings in the cost of civil foundation works is approx. Rs.1,50,000/- in Small Size
b) Savings in time to the tune of 20 days @ Rs.2500/- per day. This savings is recurring for every relocation of the weighbridge.
Reduction In Load Distance :