Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Work Regarding The Installatio" in Dadri, India.
Directorate of Local Bodies UP
Dadri, Uttar Pradesh, India
NTID 46090078
- Opening Date : Sat 29th August, 2026
- Closing Date : Thu 27th August, 2026
- ₹ 4710000.00
- NTID 46090078
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
435500.00 -
Document Cost
5546.00 -
Estimated Cost
4710000.00
BOQ Items Total Items : 4 | Total Qty : 352.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil(loam,clay or sand)including lift upto 1.50M and lead 30M and including filling watering and ramming of excavated earth into the trenchesor into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in chrge upto a distance of 30M from the foundation trenches 251(a) | 129.6 | M3 |
| 2 | Providing and Fixing of precaste R.C.C Bench/Stone bench designed for Outdoor sitting use made from reinforced cement concrete of perfect size as per direction of engineer in charge (M.R) | 150 | No |
| 3 | cement concrete with 4 cm gauge approved brick ballast, fin sand & cement in the proportion of 12:6:1 including supply of all materials, labour, tools & plants, labour cess etc. required for proper completion of the work S.I.No 273 | 36.45 | M3 |
| 4 | cement concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No. 279a | 36.45 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054