- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Gujarat Mineral Development Corporation Limited
- >
NTID 43942901
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowWork Of Infrastructure Develop in Ahmedabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Work Of Infrastructure Develop" in Ahmedabad, India.
- Opening Date : Refer Documents
- Closing Date : Thu 5th March, 2026
- ₹ 12390497.00
- NTID 43942901
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
123905.00 -
Document Cost
4248.00 -
Estimated Cost
12390497.00
BOQ Items Total Items : 50 | Total Qty : 7392
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation in any kind of soil incl. RCC or asphalted surface 0 to 1.50 mt depth incl. dewatering if required at cost and risk of agency including all labour, tools, mechanical tools etc. & shoring, strutting, making the bottom level and sides in plumb incl. watering, ramming and consolidating the bottom etc. incl. removing the surplus stuff if any within all lead and lift using the selected stuff for back filling to foundation, (Test of Soil for back filling is agency scope) in side trenches and plinth in layers of 20 cms. th. with watering, consolidating etc. comp. as directed by Engineer Incharge. | 31.000 | Cu.Mt. |
| 2 | Excavation for foundation in any kind of soil 1.5 to 3.00 mt depth incl. dewatering if required at cost and risk of agency including all labour, tools, mechanical tools etc. & shoring, strutting, making the bottom level and sides in plumb incl. watering, ramming and consolidating the bottom etc. incl. removing the surplus stuff if any within all lead and lift using the selected stuff for back filling to foundation,(Test of Soil for back filling is agency scope) in side trenches and plinth in layers of 20 cms. th. with watering, consolidating etc. comp. as directed by Engineer Incharge. | 2.000 | Cu.Mt. |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering. | 23.000 | Cu.Mt. |
| 4 | Filling in Plinth with sand under floors (brought from outside including any lead and lift, loading and unloading, spreading) including watering, ramming, consolidating etc. complete | 11.000 | Cu.Mt. |
| 5 | Filling in Foundation and plinth with Murram or selected soil (brought from outside including any lead and lift, loading and unloading, spreading of soil) in layers of 20cm. Thickness including watering, ramming and consolidating etc.complete as per directed by Engineer-in-charge | 20.000 | Cu.Mt. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054